Chevron Relocation Sepulveda Moraga to Montana 10/24/11
The second phase of the Chevron reconfiguration on Sepulveda Bl and Moraga Dr is scheduled to start tonight. The new traffic configuration on Sepulveda Bl between Moraga Dr and Montana Av will be in place for three months. It is recommended the traveling public plan their route in advance and anticipate delays when driving through the construction zone. For additional information, please see attached notice. Thank you.
Olga N. Arroyo
I-405 Sepulveda Pass Improvements Project
Metro Community Relations - Sunset Segment
Office: 310-846-2357
Hotline 213-922-3665
Visit us online:
Facebook: www.facebook.com/405project
Twitter: www.twitter.com/I_405
Web: www.metro.net/I-405
The Official Brentwood Glen Association BLOG for our neighborhood featuring news, events, alerts and information that concern us all.
Showing posts with label 405 Construction. Show all posts
Showing posts with label 405 Construction. Show all posts
Monday, October 24, 2011
Thursday, September 1, 2011
Construction Notice
ATTENTION RESIDENTS AND BUSINESS OWNERS IN THE VICINITY OF SEPULVEDA BL AT CHURCH LN/OVADA Pl
The contractor will relocate a storm drain line and replace a catch basin and manhole at Sepulveda Bl and Church Ln, and Ovada Pl from Acanto St to Sepulveda Bl.
What: Storm drain line relocation
When: Work is ongoing and is anticipated to be completed on October 22, 2011. Anticipated work hours are from 9am and 3:30pm.
Where: Sepulveda Bl at Church Ln/Ovada Pl and Ovada Pl from Sepulveda Bl to Acanto St
What to Expect:
Access to pedestrians will be maintained outside the work area.
Sepulveda Bl will be maintained with one lane in each direction.
EB Ovada Pl traffic will be detoured to NB Sepulveda Bl, to EB
Moraga Dr to Acanto St, back to Ovada Pl.
WB Ovada Pl traffic will be detoured to NB Acanto St, to WB Moraga Dr to SB Sepulveda Bl, back to Ovada Pl/Church Ln.
Emergency vehicle access will be maintained.
Work is weather permitting and subject to change.
The contractor will relocate a storm drain line and replace a catch basin and manhole at Sepulveda Bl and Church Ln, and Ovada Pl from Acanto St to Sepulveda Bl.
What: Storm drain line relocation
When: Work is ongoing and is anticipated to be completed on October 22, 2011. Anticipated work hours are from 9am and 3:30pm.
Where: Sepulveda Bl at Church Ln/Ovada Pl and Ovada Pl from Sepulveda Bl to Acanto St
What to Expect:
Access to pedestrians will be maintained outside the work area.
Sepulveda Bl will be maintained with one lane in each direction.
EB Ovada Pl traffic will be detoured to NB Sepulveda Bl, to EB
Moraga Dr to Acanto St, back to Ovada Pl.
WB Ovada Pl traffic will be detoured to NB Acanto St, to WB Moraga Dr to SB Sepulveda Bl, back to Ovada Pl/Church Ln.
Emergency vehicle access will be maintained.
Work is weather permitting and subject to change.
Saturday, August 7, 2010
Travelers alert, Sunset Bridge demolition begins
Traveling through the Westside of Los Angeles for the next 6 days could become difficult or a nightmare, especially if you are planning on traveling at night on the I-405. For those wishing to travel to the San Fernando Valley, the South Bay or planning an excursion out of the city allow extra time. Starting today at 9 PM Metro begins demolition of the Sunset Bridge. This is part of the I-405 Sepulveda Pass Widening Project that extends 10 miles from the I-10 to the U.S. 101....Read More
Friday, July 23, 2010
"Closures to begin on 405 Freeway, Sunset Boulevard for bridge project"
Please click the link below to read the LA Times article which discusses some of the expected effects of the Sunset Bridge demolition project.
http://articles.latimes.com/2010/jul/23/local/la-me-0723-sunset-20100723
http://articles.latimes.com/2010/jul/23/local/la-me-0723-sunset-20100723
Thursday, July 15, 2010
Big blankets vs. 405 night noise
Click below to read a recent article from Zev Yaroslavsky's blog on how the 405 construction managers intend to mitigate construction noise during the demolition of the Sunset Blvd. bridge.
http://zev.lacounty.gov/news/transportation/big-blankets-vs-405-night-noise
http://zev.lacounty.gov/news/transportation/big-blankets-vs-405-night-noise
Sunday, July 11, 2010
Brentwood Glen Metro Updates
Bicycle Path: The bicycle and pedistrian path between Waterford and Constitution will be closed beginning Monday, July 12th for 4 -5 months. This is due to the construction activities of building a retaining and sound wall. Work will begin on July 15th with clearing trees, plants and soil and demolishing the existing retaining wall.
Sepulveda Blvd: Beginning July 10th Sepulveda Blvd between Montana and Sunset Blvd. (construction area) during work hours will be reconfigured to allow one lane in each direction. The Brentwood Glen and Westwood Hills has been working with Metro on this for some time now. We hope this will alleviate traffic going Eastbound on Montana and up Veteran and make it easier for traveling to the San Fernando Valley.
Friday, July 9, 2010
Recent article on 405 construction
Zev Yaroslavsky's webpage posts an article about the construction on the 405. Featured in the article is BGA President, Cori Solomon. (Please find a link to the article in the "Helpful Links" section.)
Subscribe to:
Posts (Atom)

